ArcelorMittal Temirtau, Kazakhstan
ArcelorMittal Temirtau, Kazakhstan
Webseite:
http://www.arcelormittal.kz
das Verwirklichungsjahr:
2016
Die Technologien:
Simatic S7-317/ Sinamics DCM/ S7/ WinCC/ Industrial network Profibus DP
Projektphase:
Completed
Über das Projekt:
Control system of electric locomotive is based on electric lokomotive EKU-1M that is working in complex of coke-oven battery No 1 of metallurgical plant Arcelor Mittal Temirtau, Kazakhstan.
CARGILL sunflower oil crush plant, Lusaka (Zambia)
2015
Software development for the Soap Transfer System site and commissioning works
CARGILL sunflower oil crush plant, Lusaka (Zambia)
2015
Modernization of the control system of the oil extraction plant 
Fabricant LLC
2015
Automated system of management accounting
LLC "Volkswagen Rus”, Kaluga, Russia
2009
Controller Simatic S7 programming of overhead equipment of lines KW, WF, EHB, EHB dors, ZP8
PJSC "ArcelorMittal Kryviy Rih"
2015
Automated control system of overhead traveling cranes, special bogie truck with carrying capacity of 5+5 tons, Krivoy Rog
Die Softwareinstallation-, und Einstellung für den Elektrosteuerschrank RIO 3 ТП für den Sinterbetrieb. Die Rekonstruktion der Sintermaschine № 1
2013-2015
Die Projektierung des Elektrosteuerschranks RIO3 auf der Basis von Quantum-Steuereinheiten mit dem Set von Eingangs-, und Ausgangsmoduln für die Einschaltung von Digitalsignalen und Analogsignalen aus den Anlagen.
Kononovskij Getreideelevator, Dorf Petrovskoje , Dunayevetskij Gebiet, Chmelnytskaja Oblast
2013-2015
Projekt, Lieferung, Montage, Inbetriebnahme.
Ölgewinnungsbetrieb, CARGILL, Kachowka, die Ukraine
2015
Die Modernisierung des Steuerungssystems für die hydraulische Mehrzweckautokippvorrichtung
Ölgewinnungsbetrieb, CARGILL, Kachowka, die Ukraine
2015
Die Modernisierung des Steuerungssystems für Bodenlager
Ölgewinnungsbetrieb, CARGILL, Kachowka, die Ukraine
2015
Die Modernizierung des Steuerungsystem für die Ölextraktionsabteilung
Das Tracking-System für die eingehenden Rohstoffe und die Ausgangsproduktion auf dem Territorium des Privatunternehmens «OLIJAR»
2014
Das Tracking-System für die eingehenden Rohstoffe und die Ausgangsproduktion dient für die Transportsteuerung und fürs Tracking vom einkommenden Fahrzeug mit Rohstoffe und vom Ausgangsfahrzeug mit Fertigerzeugnissen.
KERNEL GROUP «Ukrainian Black Sea Industry» LLC, Ilyichyovsk, Odessa region, Ukraine
2014-2015
Reconstruction of the the sunflower seeds processing line with increasing productivity up to 1700 tons per day
CARGILL Plant, Efremov, Tula, Russia
2015
Oil site PCS7 system update
CARGILL Plant, Efremov, Tula, Russia
2015
ACS for rail car raw material unload with hot flush using
IISCO Steel Plant (ISP), (India)
2014
Development of software PLC, HMI, VFD and start-up and commissioning of 4 cranes of load-carrying capacity up to 120 tons
«Kharkiv branch of PJSC «SUN InBev Ukraine», Kharkiv
2013-2014
Laying and connection of 0,4 kV cable to the water and wastewater treatment facilities
Branch «Steppe elevator Balakleya» "АТ Cargill» LLC (town Savintsy, Balakleya district, Kharkiv region, Ukraine)
2014
Branch «Steppe elevator Balakleya» "АТ Cargill» LLC (town Savintsy, Balakleya district, Kharkiv region, Ukraine)  
PJSC «CENTRAVIS PRODUCTION UKRAINE», Nikopol
2014
Modernization of the overhead crane № 35 of the pipe-drawing shop via switching the lifting and overhead crane mechanism to the frequency regulation, PJSC «CENTRAVIS PRODUCTION UKRAINE», Nikopol
«Modernization of ACS of extractors А201.1 and А201.2», PJSC “Zaporizhzhya oil and fat plant”
2014
«Modernization of ACS of extractors А201.1 and А201.2», PJSC “Zaporizhzhya oil and fat plant”
ACS of TP of the feeding, transportation and removal of semi-finished products on the production line Burde on PJSC “Centravis Production Ukraine”.
2014
Modernization of the control system of feeding, transportation and removal of semi-finished products on the production line Burde in the tube drawing shop on PJSC «Centravis Production Ukraine».
CJSC „Zaporozhye oil and fat plant”.
2014
Replacement of equipment in the extraction electric section at the sunflower seed processing shop at the CJSC „Zaporozhye oil and fat plant".
Modernization of elevator PLC equipment
2014
Development of design and software documentation for modernization of elevator PLC equipment.
ACS von TP of hot metal desulphurization with granulated magnesium, Qingdao
2014
Only reliable and worldwide known manufacturers as SIEMENS, PHOENIX CONTACT, RITTAL were used while designing. Design documentation was developed in design environments EPLAN Electric P8, AutoCAD, Microsoft WORD and Microsoft EXCEL.
PJSC “Kyiv Cardboard and Paper Mill”, Obuhov
2014
ACS of TP of paper making machine №2
Crimea breeze, Parkovoe, Ukraine
2013-2014
ACS of TP, electric power plant, control and measurement equipment.
Grain elevator with a storage capacity of 70 thousand tones, LLC «Panda» (Kotovsk, Odessa region).
2013-2014
ACS of TP, electric power plant, control and measurement equipment and lighting.
PJSC “Kyiv Cardboard and Paper Mill”, Obuhov
2014
ACS of TP of paper making machine №2
«Automation and electric power supply of the borehole»
2014
Development of the control program for borehole №3, commissioning works, including integration into the existing control system for boreholes №1 and №2.
PJSC Kraft Foods Ukraine (Trostianets, Sumy region)
2013-2014
ACS of TP, measurement and control equipment
PJSC “Farmak”, Kyiv
2014
ACS of section №3 of liquid medicinal products in bottles. Shop №1. Reconstuction of СІРs system.
JSC “VETROPACK “Gostomel glass factory”
2013
Modernization of the control system SVP №83
Investment project
2012
Feasibility study for automatic transport system
“SIRIUS EXTRUSION”, Khmelnitsky
2011
Integration of control system of raw material feed to silo plastic film №5 to an existing control system of material feed to silo. Project, procurement, assembly, adjustment
JSC Vetropack Gostomel Glass Factory
2011
Service of Siemens equipment
“DANONE DNIPRO”, Kherson
2011
Modernization of control panel SPS (sewage pumping stations) and SWPS (storm water pumping station) of control system with integration of data into an existing visualisation system. Design, supply, installation and commissioning.
JSC "Semiconductor Plant” Zaporizhzhya
2011
ACS TP, despatching, MCC energy distribution for polycrystalline silicon production. Project, delivery, adjustment
JSC "Semiconductor Plant” Zaporizhzhya
2011
ACS TP of despatching and MCC energy distribution for hydrogen station. Project, delivery, adjustment

     