When modernizing devices, it is possible to identify errors in the installation of the system from the very beginning.
Therefore, the goal of our team was to correct errors at all possible levels of chiller operation.
INFOCOM LTD has performed a number of works:
- design of control cabinets and cable systems
- development of chiller control software and integration into the existing plant control system
- electrical installation works at the facility:
- dismantling of existing/installation of new cable support systems
- dismantling of existing/installation of new cables for connection of motors and field devices
- installation and connection of MCC Sivacon S8, PLC, OP, VSD Sinamics G150 (2 pcs.), PFC unit cabinets
- commissioning and adjustment works
The qualification of the team and the use of experience in the development of projects for the automation of the most advanced technologies allows our specialists to quickly and accurately complete tasks on time.
To order the modernization of chillers for the existing finished goods warehouse with the replacement of drives, please contact our managers: